Home › Forums › LUG discussions › CSC Locomotion Weekend – 1/16/26 to 1/18/26
- This topic has 27 replies, 9 voices, and was last updated 1 day, 11 hours ago by
Tim.
-
AuthorPosts
-
July 15, 2025 at 3:21 pm #65133
TimModeratorI have received an email from Nicole at the Carnegie Science Center regarding Locomotion Weekend 2026. Load in will be on Friday, January 16, 2026, and the show will be Saturday and Sunday, January 17-18, 2026. Just wanted to get these dates out there so we can get it on the LUG Calendar.
Also, the Center is running a poll to decide what new model to add to the CSC Miniature Railroad Display – https://carnegiesciencecenter.org/mrrv-poll-2026/ – in case anyone wants to participate. 🙂
July 15, 2025 at 8:56 pm #65141
Gabe VisticaParticipantFollowing
July 15, 2025 at 10:28 pm #65145
Will McDineParticipantFollowing as well. I should be available for this in some fashion. No January trips planned this year.
July 17, 2025 at 7:35 am #65168
Tom GarrityParticipantI will be there with the trains all weekend but I should be able to help setup on Friday
July 19, 2025 at 10:24 pm #65213
DanParticipantSubbed
July 22, 2025 at 12:47 pm #65292
PLAYINGWITHECHOESParticipantM.P.Lynes reporting for train duty.
I will have my giant blue Schnabel car and a ton of new really long hazmat train cars ready for that R 104 loop, including that brand new KUA flask car which will its world debut running at TUBS in November. Plenty of overhang drama with these educational STEM models. @rcgrier3406 and @amplef0rth, crowds love seeing them get close to buildings. XD
If Glenn can’t make it, I can provide extra trains for the other loop too or coordinate with other LUG train runners as well and share my every growing army of batteries. (Someday I’ll have a million of them…) LOLOLOL
November 5, 2025 at 4:05 pm #66660
PLAYINGWITHECHOESParticipantOddly enough as we prepare trains for TUBS, CSC Locomotion Weekend is only 2 months away. Are we planning on a layout large enough to feature the Behemoth Bascule Bridge? Or are we expecting the same footprint, more or less as previous exhibits there?
I can bring the bridge if you guys want it for this show too.
November 5, 2025 at 7:10 pm #66662
Bob GrierParticipant@playingwithechoes, let’s discuss at TUBS. I think you, @timf and I are all in the same display area.
Tim confirmed last week that we would be there again this year, but other than that no real planning has been done yet for this.
November 7, 2025 at 5:17 pm #66684
TimModeratorWe can ask for more space. Not certain we would get it. Let’s discuss next weekend. 🙂
November 8, 2025 at 7:03 pm #66706
TimModeratorI went ahead and asked Nicole at the CSC whether any additional space might be available.
November 10, 2025 at 11:57 am #66720
PLAYINGWITHECHOESParticipantSure thing, we can talk at TUBS. I figured we can look at the TUBS layout and estimate out how much space is actually needed if we want to utilize the bridge at CSC.
November 10, 2025 at 1:14 pm #66726
Bob GrierParticipantHere’s a first pass layout to chew on! I had some time over the weekend to play with this.
For reference, we’ve always used 30″x72″ venue tables for this event, primarily because of the logistics of getting the LUG tables there and back, and also to avoid the bottleneck at the elevator and loading dock with the other train clubs that typically bring large pre-assembled modules to this event. Our usual “layout” is on a grid that’s 3 tables wide by 4 tables deep (11 tables total with an open space in the middle). To add the bridge, I added one more table to the left side making the grid 3 tables wide by 5 tables deep (12 tables total with a bigger open space in the middle).
Couple of things to note:
* We’ve always left a 5″ space open between the MILS bases and the edge of the tables. To make the bridge fit, I’m right to the edge of the tables on the top and bottom sides in this layout.
* In order to fit, the bridge has to start and end right at the MILS bases that either exit or enter the long radius curves. Don’t know if this will be an issue with some of @playingwithechoes longer wheelbase engines and cars, especially as they go under the drive side structure of the bridge.
* Since the movable portion of the bridge is 40″ wide, I had to land 10″ of that on a table. That may be an issue with the structure of the bridge at the landing point.
* In this layout we would lose one of the 9v loops that would have normally been on the right side, but that still leaves us with (2) RC long radius loops, (1) 9v double track loop, and (1) 9v single track loop.
* We used our own stanchions last year and would definitely need to bring them again for this layout.By comparison, our footprint last year was 18 ft. wide by 10 ft. deep without stanchions, and our footprint with this layout would be 18 ft. wide by 12′-6 deep without stanchions.
Attachments:
You must be logged in to view attached files.November 10, 2025 at 1:24 pm #66728
Gabe VisticaParticipant* We’ve always left a 5″ space open between the MILS bases and the edge of the tables. To make the bridge fit, I’m right to the edge of the tables on the top and bottom sides in this layout.
Assuming the tables are exactly 30″ deep and there’s no gaps between them, this will actually have a roughly 2-stud overhang on each end, since 32×32 plates are oh-so-slightly larger than 10″x10″.
November 10, 2025 at 1:33 pm #66730
Bob GrierParticipantThat’s right @gabevistica. Another reason why we always left space around the perimeter in the past. We might want to leave space (or use a spacer) between two of the tables on the left side to account for this and let the MILS bases span the gap.
November 11, 2025 at 11:39 am #66746
PLAYINGWITHECHOESParticipantThanks for trying to fit the bridge in the layout. I can probably run the blue Schnabel car without the flask in the center to make it around the corners and right through the bridge tower modules without extra straight track before it to straighten out, if needed. I think there’s enough clearance to make the corners work so we can save space as you suggested. 🙂
Big Boy and Challenger I think were fine with the R104 corner overhangs relative to the tower columns.So if we can get some more space for at least the drawbridge part to be 40″ clear that would be great as it has underside structure below the track deck that can’t go over a table. The bridge in action would be a great showpiece at CSC; but, if CSC says no extra room, the bridge can wait till the March HG show. Keep me posted on developments and whatever seems best for the LUG and our allotted display space.
November 16, 2025 at 9:31 pm #66802
JadeParticipantI’ll try to come if I’m all caught up at school. I usually come Sunday and bring the Harry Potter train I have that’s stationary.
November 21, 2025 at 11:50 am #67009
TimModeratorI received official notification from the Science Center that we have the same layout space as last year – “Steel City LUG 12’ x 20’ twelve 6 ft tables”.
We could still incorporate the bridge (maybe along the front or back lengths) but that would eat up a fair amount of display space.
November 21, 2025 at 12:04 pm #67010
Tom GarrityParticipantDisappointing. I was talking with the gal in charge about changes to the floorplan necessary du to the return of a couple of longtime exhibitors who are returning after a several year absence. I was trying to expand my train layout but that isn’t possible this year. It ishoing to be a packed room.
November 21, 2025 at 1:23 pm #67013
Gabe VisticaParticipantI don’t think we can make the bridge work with normal tables unless we want to try using a lot of Technic pins to hold it all together. You just end up with too many big gaps trying to make 30-inch tables work with a 40-inch span (not to mention those gaps would increase our footprint).
November 21, 2025 at 3:29 pm #67014
PLAYINGWITHECHOESParticipantIf we can figure a way to make the tables work, or provide two small custom tables to fit the allotted parameters of the middle back table with 40″ gap, we could run the bridge on the back broadside as I don’t want to take from John’s winter village. That’s always a cute front facing attraction and the industrial looking bridge is tall enough to be visible from the back. Fortunately, it’s a 360 walk around display so people will still see it there.
I’d be willing to forgo the railyard and swap trains on a back table like in years past. Or have disconnected side tracks on remaining layout modules in that area to showcase static rollingstock.
If that’s possible to do, great. If not, it’s okay if the bridge waits till HG show. I’m quite happy with how well it worked at The Ultimate Brick Show. I don’t know if Josh has any custom small LUG tables to fit here but maybe he can check. 🙂
November 30, 2025 at 9:49 pm #67122
JoshKeymasteranyone thinking about how to get stuff from trolley museum for that weekend? maybe we do try to empty out of trolley museum at tear down and divide and conquer all the bins since I can’t fit everything in the van. If you know you won’t use the lug tables, I think I can fit all/just those in my van.
as to custom tables, we built a 2×3 standard baseplate table, and I’ve got plenty of wood to make whatever other dimensions needed at request/confirmation.
December 1, 2025 at 9:50 am #67129
Bob GrierParticipantanyone thinking about how to get stuff from trolley museum for that weekend? maybe we do try to empty out of trolley museum at tear down and divide and conquer all the bins since I can’t fit everything in the van. If you know you won’t use the lug tables, I think I can fit all/just those in my van.
as to custom tables, we built a 2×3 standard baseplate table, and I’ve got plenty of wood to make whatever other dimensions needed at request/confirmation.
@joshhall, I just signed up for teardown at Trolley on the 21st and can take a bunch of the bins of MILS stuff that we’ll need for Locomotion Weekend, but I don’t know if I can take it all and still have room for the stuff I need to take to Locomotion. @timf, can you take some of it as well, especially the stanchions??As of right now, the Science Center has said that we can’t have any more space than what we had last year, so it’s doubtful that we’ll be able to modify the layout to include Michael’s bridge. For sure we won’t be using any of the LUG tables, but we will need some of the stanchions.
December 1, 2025 at 9:53 am #67130
Gabe VisticaParticipantI think the LUG stanchions are still at Josh’s house, we used the museum’s stanchions for Fall Trolley.
December 1, 2025 at 10:03 am #67131
JoshKeymasterAll stanchions are at my house, but I’m happy to take them to trolley tear down for someone else to take home.
December 1, 2025 at 10:11 am #67132
Bob GrierParticipantAll stanchions are at my house, but I’m happy to take them to trolley tear down for someone else to take home.
Sounds good. I’ll let you know how many we need beforehand.
On another note, I still have (4) LUG commercial tables (6 ft. x 30″), (4) LUG chairs and the easy-up that Greg donated to the LUG earlier this year sitting in my garage. If they’re needed for any of the December events, let me know and I can arrange a drop-off or bring them back to @joshhall’s house next time I’m in the South Hills.
-
AuthorPosts
- You must be logged in to reply to this topic.
